Texas Instruments ADC34RF72EVM Evaluation Module

Texas Instruments ADC34RF72EVM Evaluation Module is developed to quickly and easily demonstrate the ADC34RF7x family of high-speed analog-to-digital converters (ADCs). The ADC34RF72EVM is populated with an ADC34RF72. The ADC34RF72 is a 16-bit ADC, quad-channel ADC with a JESD interface, and can operate at sample rates up to 1.5GSPS.

The TI ADC34RF72EVM enables the evaluation of all device speed grades and the number of channels.

Features

  • -164.2 dBFS/Hz noise spectral density
  • 1.8GHz full power input bandwidth (-3dB)
  • Eight digital down-converters can be configured in single band, dual band, and octal band configurations, supporting real and complex decimation with factors starting at /2,/3,/5 up to 32768
  • Power consumption of 0.95W/channel (1.5GSPS)
  • 48-bit NCO phase coherent frequency hopping
  • Serial JESD interface supporting lane rate up to 24.75Gbps
  • Multiple integrated DSP features such as 96-tap/ch PFIR equalizer and fractional delay filter

Applications

  • Phase array radar
  • Wafer inspection
  • Spectrum analyzers
  • Software-defined radio (SDR)
  • Electronic warfare
  • High-speed digitizer
  • Cable infrastructure
  • Communications infrastructure

Kit Contents

  • ADC3xRF72EVM
  • Mini - USB Type X cable
  • JTAG-HS2 programming dongle
  • Power cable for 12V jack

Overview

Infographic - Texas Instruments ADC34RF72EVM Evaluation Module

Hardware Connection Block Diagram

Block Diagram - Texas Instruments ADC34RF72EVM Evaluation Module
Inilathala: 2025-10-14 | Na-update: 2025-10-28